Town wide maintenance is necessary to extend the lifespan of existing paved roadways. Cracks have formed in these roadways as a result of weathering and usage, necessitating essential maintenance.
Projects — TIB Project Information
TIB Project Information
Town of Index's 2025 Crack Seal
2-P-821(001)-1
2-P-821(001)-1
2025 Crack Seal
Multiple Locations
FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $28,050
County: Snohomish | Legislative District: 12 | Project Length: 0.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | INDEX |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Design |
Legislative District | 12 |
Congressional District | 8 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | Local Access |
Type of Work | Resurfacing |
Project Contact | Jenny Johnson |
Contact Email | townhall@cityofindex.org |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 12/10/2024 |
Bid Auth. Approval | 06/01/2025 | |
Construction Approval | 06/15/2025 | |
Project Closeout | 07/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 28,050 | 28,050 |
Other Construction | 0 | 0 |
Total Construction | 28,050 | 28,050 |
Total TIB Funding | 28,050 | 28,050 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
INDEX | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Proposed solution includes a town wide crack seal.
Existing Condition
Project Benefits
- Fills Cracks
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |