Town of Eatonville's Eatonville Hwy W Overlay
2-P-811(006)-1
2-P-811(006)-1
Eatonville Hwy W Overlay
Emerald Ridge Dr to Center St W
FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $533,573
County: Pierce | Legislative District: 2 | Project Length: 0.39 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | EATONVILLE |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Design |
Legislative District | 2 |
Congressional District | 8 |
Federal Route Number | B273 |
Project Length | 0.39 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Eric Phillips |
Contact Email | townadmin@eatonville-wa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/14/2025 | 01/16/2025 |
Bid Auth. Approval | 11/05/2025 | |
Construction Approval | 01/20/2026 | |
Project Closeout | 09/04/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 64,600 | 68,000 |
Right of Way | 0 | 0 |
Total Design | 64,600 | 68,000 |
Construction Engineering | 42,750 | 45,000 |
Construction Contract | 426,223 | 448,656 |
Other Construction | 0 | 0 |
Total Construction | 468,973 | 493,656 |
Total TIB Funding | 533,573 | 561,656 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
EATONVILLE | 28,083 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 28,083 | 5.0% |
Project Description
Eatonville Highway E - Emerald Ridge Dr to Center St W 2-inch grind and overlay
Existing Condition
Project Benefits
- The pavement condtion rating of this segment of Eatonville Highway W is 45.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |