The pavement condition rating of Hunts Point Lane is 54.
Projects — TIB Project Information
TIB Project Information
Town of Hunts Point's Hunts Point Lane Overlay
2-P-122(001)-1
2-P-122(001)-1
Hunts Point Lane Overlay
Hunts Point Lane
FY 2026 Small City Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $312,862
County: King | Legislative District: 48 | Project Length: 0.31 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | HUNTS POINT |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Bid Authorization |
Legislative District | 48 |
Congressional District | 1 |
Federal Route Number | 9999 |
Project Length | 0.31 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Stacia Schroeder |
Contact Email | engineer@huntspoint-wa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/07/2025 | 01/07/2025 |
Bid Auth. Approval | 03/01/2025 | 02/07/2025 |
Construction Approval | 05/06/2025 | |
Project Closeout | 12/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 13,500 | 15,000 |
Right of Way | 0 | 0 |
Total Design | 13,500 | 15,000 |
Construction Engineering | 46,057 | 51,175 |
Construction Contract | 253,305 | 281,450 |
Other Construction | 0 | 0 |
Total Construction | 299,362 | 332,625 |
Total TIB Funding | 312,862 | 347,625 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
HUNTS POINT | 34,763 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 34,763 | 10.0% |
Project Description
Hunts Point Lane - Hunt Point Rd to cul-de-sac 2-inch grind and overlay
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |