Town of Yarrow Point's 2025 Overlay
2-P-120(002)-1
2-P-120(002)-1
2025 Overlay
Multiple Locations
FY 2026 Small City Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $540,000
County: King | Legislative District: 48 | Project Length: 0.81 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | YARROW POINT |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Bid Authorization |
Legislative District | 48 |
Congressional District | 1 |
Federal Route Number | 9999 |
Project Length | 0.81 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Stacia Schroeder |
Contact Email | sschroeder@yarrowpointwa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 12/11/2024 |
Bid Auth. Approval | 03/01/2025 | 02/03/2025 |
Construction Approval | 05/06/2025 | |
Project Closeout | 12/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 9,000 | 10,000 |
Right of Way | 0 | 0 |
Total Design | 9,000 | 10,000 |
Construction Engineering | 72,000 | 80,000 |
Construction Contract | 459,000 | 510,000 |
Other Construction | 0 | 0 |
Total Construction | 531,000 | 590,000 |
Total TIB Funding | 540,000 | 600,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
YARROW POINT | 60,000 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 60,000 | 10.0% |
Project Description
2-inch grind and overlay of the following segments 94th Avenue NE - NE 38th St to 92nd Ave NE NE 40th Street - 92nd Ave NE to 95th Ave NE NE 38th Street - 92nd Ave NE to 94th Ave NE
Existing Condition
Project Benefits
- The pavement condition ratings of the three segment varies from 50 to 54.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |