City of Connell's 2025 Crack Seal

2-E-926(007)-1

2-E-926(007)-1
2025 Crack Seal

Multiple Locations

FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $108,300

County: Franklin   |   Legislative District: 9   |   Project Length: 0.00   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency CONNELL
Funding Year 2026
Program SCPP
Current Phase Design
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class
Type of Work
Project Contact Hallie Tuck
Contact Email htuck@connellwa.org
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/01/2025 01/27/2025
Bid Auth. Approval 06/01/2025
Construction Approval 07/01/2025
Project Closeout 10/01/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 108,300 114,000
Other Construction 0 0
Total Construction 108,300 114,000
     
Total TIB Funding 108,300 114,000

Local Funding Partners

Funding Amount Percent
CONNELL 5,700 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 5,700 5.0%

Project Description

All cracks will be cleaned and crack filled with hot poured crack sealant per the WSDOT Standard Specifications.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.