TIB Project Information

Town of Rosalia's 2025 Overlay

2-E-917(006)-1

2-E-917(006)-1
2025 Overlay

Multiple Locations

FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $167,315

County: Whitman   |   Legislative District: 9   |   Project Length: 0.32   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency ROSALIA
Funding Year 2026
Program SCPP
Current Phase Design
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 0.32 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Leland Root
Contact Email mayorroot@rosaliatown.org
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/01/2025 02/12/2025
Bid Auth. Approval 05/13/2025
Construction Approval 06/24/2025
Project Closeout 12/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 20,000 20,000
Right of Way 0 0
Total Design 20,000 20,000
     
Construction Engineering 13,400 13,400
Construction Contract 133,915 133,915
Other Construction 0 0
Total Construction 147,315 147,315
     
Total TIB Funding 167,315 167,315

Local Funding Partners

Funding Amount Percent
ROSALIA 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

2' overlay

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments