Town of Oakesdale's 2025 Seal Coat

2-E-915(005)-1

2-E-915(005)-1
2025 Seal Coat

Multiple Locations

FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $1,000,000

County: Whitman   |   Legislative District: 9   |   Project Length: 5.00   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency OAKESDALE
Funding Year 2027
Program SCPP
Current Phase Design
Legislative District 9
Congressional District 5
Federal Route Number
Project Length 5.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Mary Degon
Contact Email townofoakesdale@msn.com
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   03/28/2025
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 04/15/2025 03/31/2025
Bid Auth. Approval 05/15/2025
Construction Approval 06/15/2025
Project Closeout 08/01/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 25,000 25,000
Right of Way 0 0
Total Design 25,000 25,000
     
Construction Engineering 100,000 100,000
Construction Contract 875,000 875,000
Other Construction 0 0
Total Construction 975,000 975,000
     
Total TIB Funding 1,000,000 1,000,000

Local Funding Partners

Funding Amount Percent
OAKESDALE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Combination of Pulverization, chip seal, and scrub seal to repair and maintain City streets.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.