City of Newport's 2025 Chip Seal
2-E-892(008)-1
2-E-892(008)-1
2025 Chip Seal
Multiple Locations
FY 2026 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $238,628
County: Pend Oreille | Legislative District: 7 | Project Length: 2.42 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | NEWPORT |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Construction |
Legislative District | 7 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 2.42 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Abby Gribi |
Contact Email | agribi@newport-wa.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 02/11/2025 |
Bid Auth. Approval | 04/30/2025 | 04/14/2025 |
Construction Approval | 05/30/2025 | 04/14/2025 |
Project Closeout | 10/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 174,684 | 0 |
Other Construction | 0 | 251,188 |
Total Construction | 174,684 | 251,188 |
Funding Increase | 63,944 | |
Total TIB Funding | 238,628 | 251,188 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
NEWPORT | 12,560 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 12,560 | 5.0% |
Project Description
Full depth recycling where needed with, patching and chipseal for preservation. Manhole covers will be repositioned where needed.
Existing Condition
Project Benefits
- Asset management.
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |