We have sections of roadway with significant cracking.
Projects — TIB Project Information
TIB Project Information
City of Brewster's 2025 Street Maintenance
2-E-876(006)-1
2-E-876(006)-1
2025 Street Maintenance
Multiple Locations
FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $11,091
County: Okanogan | Legislative District: 7 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | BREWSTER |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Design |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | |
Type of Work | |
Project Contact | Lee Webster |
Contact Email | lee.webster@brewsterwa.us |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2025 | 02/26/2025 |
Bid Auth. Approval | 03/01/2025 | |
Construction Approval | 04/01/2025 | |
Project Closeout | 10/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 11,091 | 11,675 |
Other Construction | 0 | 0 |
Total Construction | 11,091 | 11,675 |
Total TIB Funding | 11,091 | 11,675 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
BREWSTER | 584 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 584 | 5.0% |
Project Description
We would like to crack seal as much as time allows next year, in preparation for chip seal in various locations during 2026-2027. We propose to rent a crack seal machine from Asphalt Supply for two weeks, and to purchase enough material to run the machine for those two weeks. Application will be handled by City staff. We will crack seal beginning with the worst sections and go until we run out of material, concentrating on 7th Street, Hospital Way and a few other isolated areas.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |