Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of George's 2025 Otta Seal

2-E-858(009)-1

2-E-858(009)-1
2025 Otta Seal

Multiple Locations

FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $691,810

County: Grant   |   Legislative District: 13   |   Project Length: 4.02   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency GEORGE
Funding Year 2026
Program SCPP
Current Phase Design
Legislative District 13
Congressional District 4
Federal Route Number 9999
Project Length 4.02 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Aaron Harwood
Contact Email pwd@cityofgeorge.org
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 03/01/2025 01/27/2025
Bid Auth. Approval 04/30/2025
Construction Approval 06/30/2025
Project Closeout 12/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 57,660 57,660
Right of Way 0 0
Total Design 57,660 57,660
     
Construction Engineering 57,660 57,660
Construction Contract 576,490 576,490
Other Construction 0 0
Total Construction 634,150 634,150
     
Total TIB Funding 691,810 691,810

Local Funding Partners

Funding Amount Percent
GEORGE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Single Otta Seal on paved streets. Double Otta Seal on gravel streets.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments