Projects — TIB Project Information
TIB Project Information
City of Bridgeport's 2025 Street Maintenance
2-E-851(008)-1
2-E-851(008)-1
2025 Street Maintenance
Multiple Locations
FY 2026 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $80,000
County: Douglas | Legislative District: 7 | Project Length: 11.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | BRIDGEPORT |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Construction |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 11.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Stuart Dezellem |
Contact Email | pwsuper@nwi.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2025 | 12/19/2024 |
Bid Auth. Approval | 03/01/2025 | 02/27/2025 |
Construction Approval | 04/01/2025 | 03/21/2025 |
Project Closeout | 06/30/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 5,000 |
Construction Contract | 80,000 | 25,500 |
Other Construction | 0 | 49,500 |
Total Construction | 80,000 | 80,000 |
Total TIB Funding | 80,000 | 80,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
BRIDGEPORT | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Complete a small works roster contract to hire a contractor to crack seal the streets throughout the city.
Existing Condition
Project Benefits
- Extend asset life cycle.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |