The pavement condition rating of Rainier Road from 505 Minnesota St W to W C/L 48
Projects — TIB Project Information
TIB Project Information
Town of Rainier's FY 2021 Overlay Project
2-W-976(002)-1
2-W-976(002)-1
FY 2021 Overlay Project
Multiple Locations
FY 2021 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $136,602
County: Thurston | Legislative District: 2 | Project Length: 0.23 | TIB Engineer: Chris Langhoff | Last Payment Date: 04/15/2022
Project Information
Lead Agency | RAINIER |
Funding Year | 2021 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 2 |
Congressional District | 10 |
Federal Route Number | K341 |
Project Length | 0.23 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Charmanye Garrison |
Contact Email | rainier@ywave.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | 04/15/2022 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2019 | |
Delayed Project Date | 07/01/2022 | |
Predesign Approval | ||
Design Approval | 02/01/2020 | 01/21/2020 |
Bid Auth. Approval | 04/15/2021 | 04/19/2021 |
Construction Approval | 05/15/2021 | 05/25/2021 |
Project Closeout | 03/31/2022 | 04/07/2022 |
Audit Date | 04/15/2022 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 18,340 | 21,893 |
Right of Way | 0 | 0 |
Total Design | 18,340 | 21,893 |
Construction Engineering | 18,340 | 20,475 |
Construction Contract | 122,273 | 117,990 |
Other Construction | 0 | 0 |
Total Construction | 140,613 | 138,465 |
Funding Increase | 16,890 | |
Funding Surplus | - 39,241 | |
Total TIB Funding | 136,602 | 160,358 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
RAINIER | 23,756 | 14.8% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 23,756 | 14.8% |
Project Description
The work will include overlaying of Rainier Road from 505 Minnesota Street west to the City limits. This project, if funded, will include the dig out and subgrade repair of the areas showing severe alligator cracking. Traffic will be diverted around the project area using 133rd Ave SE to Centre Street as a bypass during construction. This will allow continuous traffic flow to the City and construction work to proceed uninterrupted.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |