City of South Bend's FY 2013 Sidewalk Maintenance Project
2-W-972(004)-1
2-W-972(004)-1
FY 2013 Sidewalk Maintenance Project
Multiple Locations
FY 2013 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $120,508
County: Pacific | Legislative District: 19 | Project Length: 0.05 | TIB Engineer: Chris Langhoff | Last Payment Date: 08/15/2013
Project Information
Lead Agency | SOUTH BEND |
Funding Year | 2013 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 19 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.05 mi. |
ADT | 150 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Steve Russell |
Contact Email | steve.russell@southbend-wa.gov |
TIB Engineer | Chris Langhoff |
Last Payment Date | 08/15/2013 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/18/2011 | |
Delayed Project Date | 07/01/2014 | |
Predesign Approval | ||
Design Approval | 01/01/2012 | 12/05/2011 |
Bid Auth. Approval | 05/01/2012 | 12/05/2011 |
Construction Approval | 09/15/2012 | 09/24/2012 |
Project Closeout | 06/15/2013 | 08/08/2013 |
Audit Date | 08/15/2013 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 5,622 |
Right of Way | 0 | 0 |
Total Design | 0 | 5,622 |
Construction Engineering | 0 | 8,127 |
Construction Contract | 47,060 | 106,759 |
Other Construction | 0 | 0 |
Total Construction | 47,060 | 114,886 |
Funding Increase | 73,448 | |
Total TIB Funding | 120,508 | 120,508 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SOUTH BEND | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
This project will reconstruct 280 feet of existing sidewalk along the east side of Memorial Drive from SR-101 to 1st Street. The project will provide ADA compliant access to local facilities.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |