City of Long Beach's FY 2017 Overlay Project

2-W-970(001)-1

2-W-970(001)-1
FY 2017 Overlay Project

Multiple Locations

FY 2017 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $238,672

County: Pacific   |   Legislative District: 19   |   Project Length: 0.31   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 08/10/2017

Project Information

Lead Agency LONG BEACH
Funding Year 2017
Program SCPP
Current Phase Audit
Legislative District 19
Congressional District 3
Federal Route Number 9999
Project Length 0.31 mi.
ADT 350
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact David Glasson
Contact Email dglasson@longbeachwa.gov
TIB Engineer Chris Langhoff
Last Payment Date 08/10/2017

Project Schedule

  Target Date Actual Date
Project Selection Date   11/20/2015
Delayed Project Date 07/01/2018  
Predesign Approval
Design Approval 01/15/2016 02/11/2016
Bid Auth. Approval 05/01/2016 05/04/2017
Construction Approval 01/01/2017 05/04/2017
Project Closeout 09/01/2017 08/02/2017
Audit Date   08/10/2017
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 20,949 30,001
Right of Way 0 0
Total Design 20,949 30,001
     
Construction Engineering 20,949 28,995
Construction Contract 139,664 193,258
Other Construction 0 0
Total Construction 160,613 222,253
     
Funding Increase 57,110  
Total TIB Funding 238,672 252,254

Local Funding Partners

Funding Amount Percent
LONG BEACH 13,582 5.4%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 13,582 5.4%

Project Description

Grind and overlay with some digouts.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments