City of Ilwaco's FY 2013 Sidewalk Maintenance Project

2-W-969(002)-1

2-W-969(002)-1
FY 2013 Sidewalk Maintenance Project

Multiple Locations

FY 2013 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $107,902

County: Pacific   |   Legislative District: 19   |   Project Length: 0.09   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 12/15/2014

Project Information

Lead Agency ILWACO
Funding Year 2013
Program SCPP
Current Phase Audit
Legislative District 19
Congressional District 3
Federal Route Number 9999
Project Length 0.09 mi.
ADT 100
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Dave McKee
Contact Email publicworks@ilwaco-wa.gov
TIB Engineer Chris Langhoff
Last Payment Date 12/15/2014

Project Schedule

  Target Date Actual Date
Project Selection Date   11/18/2011
Delayed Project Date 07/01/2014  
Predesign Approval
Design Approval 01/01/2012 12/29/2011
Bid Auth. Approval 05/01/2012 12/29/2011
Construction Approval 04/15/2014 04/22/2014
Project Closeout 12/31/2014 11/25/2014
Audit Date   12/15/2014
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 5,790 8,315
Right of Way 0 0
Total Design 5,790 8,315
     
Construction Engineering 5,790 11,369
Construction Contract 46,322 94,316
Other Construction 0 0
Total Construction 52,112 105,685
     
Funding Increase 50,000  
Total TIB Funding 107,902 114,000

Local Funding Partners

Funding Amount Percent
ILWACO 6,098 5.3%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 6,098 5.0%

Project Description

This project will repair a total of 450 feet of existing sidewalk in very poor condition on Advent Avenue between Spruce Street and Cedar Street and on Lake Street between Williams Street and Pearl Street. All sidewalk ramps not meeting current ADA standards will be reconstructed. This project will drastically improve the sidewalk network to the high school and the central business district.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.