TIB Project Information

City of Ilwaco's FY 2012 Overlay Project

2-W-969(001)-1

2-W-969(001)-1
FY 2012 Overlay Project

Multiple Locations

FY 2012 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $131,610

County: Pacific   |   Legislative District: 19   |   Project Length: 0.27   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 12/01/2014

Project Information

Lead Agency ILWACO
Funding Year 2012
Program SCPP
Current Phase Audit
Legislative District 19
Congressional District 3
Federal Route Number 9999
Project Length 0.27 mi.
ADT 175
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Dave McKee
Contact Email ilwacopublicworks@reachone.com
TIB Engineer Chris Langhoff
Last Payment Date 12/01/2014

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2010
Delayed Project Date 07/01/2013  
Predesign Approval
Design Approval 01/15/2011 01/28/2011
Bid Auth. Approval 03/01/2012 01/28/2011
Construction Approval 06/01/2013 05/20/2013
Project Closeout 09/01/2014 11/14/2014
Audit Date   12/01/2014
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 9,240 8,712
Right of Way 0 0
Total Design 9,240 8,712
     
Construction Engineering 9,240 10,553
Construction Contract 81,314 119,272
Other Construction 0 0
Total Construction 90,554 129,825
     
Funding Increase 50,898  
Funding Surplus - 19,082  
Total TIB Funding 131,610 138,537

Local Funding Partners

Funding Amount Percent
ILWACO 6,927 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 6,927 5.0%

Project Description

This project will repair areas of base failure with digouts and overlay Brumbach Avenue between Spruce Street and School Street with a 2-inch overlay.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments