The PCR score is 50 which is within the range for an overlay.
Projects — TIB Project Information
TIB Project Information
City of Ilwaco's FY 2012 Overlay Project
2-W-969(001)-1
2-W-969(001)-1
FY 2012 Overlay Project
Multiple Locations
FY 2012 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $131,610
County: Pacific | Legislative District: 19 | Project Length: 0.27 | TIB Engineer: Chris Langhoff | Last Payment Date: 12/01/2014
Project Information
Lead Agency | ILWACO |
Funding Year | 2012 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 19 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.27 mi. |
ADT | 175 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Dave McKee |
Contact Email | ilwacopublicworks@reachone.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | 12/01/2014 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2010 | |
Delayed Project Date | 07/01/2013 | |
Predesign Approval | ||
Design Approval | 01/15/2011 | 01/28/2011 |
Bid Auth. Approval | 03/01/2012 | 01/28/2011 |
Construction Approval | 06/01/2013 | 05/20/2013 |
Project Closeout | 09/01/2014 | 11/14/2014 |
Audit Date | 12/01/2014 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 9,240 | 8,712 |
Right of Way | 0 | 0 |
Total Design | 9,240 | 8,712 |
Construction Engineering | 9,240 | 10,553 |
Construction Contract | 81,314 | 119,272 |
Other Construction | 0 | 0 |
Total Construction | 90,554 | 129,825 |
Funding Increase | 50,898 | |
Funding Surplus | - 19,082 | |
Total TIB Funding | 131,610 | 138,537 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ILWACO | 6,927 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 6,927 | 5.0% |
Project Description
This project will repair areas of base failure with digouts and overlay Brumbach Avenue between Spruce Street and School Street with a 2-inch overlay.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |