City of Winlock's FY 2013 Overlay Project

2-W-968(001)-1

2-W-968(001)-1
FY 2013 Overlay Project

Multiple Locations

FY 2013 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Lewis   |   Legislative District: 20   |   Project Length: 0.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency WINLOCK
Funding Year 2013
Program SCPP
Current Phase Withdrawn
Legislative District 20
Congressional District 3
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class Local Access
Type of Work Resurfacing
Project Contact Greg Robinson
Contact Email
TIB Engineer Chris Langhoff
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   11/18/2011
Delayed Project Date 07/01/2014  
Predesign Approval
Design Approval 02/01/2013
Bid Auth. Approval 06/01/2014
Construction Approval 07/01/2014
Project Closeout 12/31/2014
Audit Date  
Withdrawn Date   04/29/2013

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
WINLOCK 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

This project will repair areas of base failure, place geotextile fabric, a 1-inch asphalt prelevel, and a 2-inch asphalt wearing course on SE 1st Street from Alder Street to Rice Street. Prior to constructing this project, the City is going to transfer the existing water services from a low pressure line to an 8-inch waterline. The City has the funds committed to complete this work prior to the overlay project.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments