City of Winlock's FY 2013 Overlay Project
2-W-968(001)-1
2-W-968(001)-1
FY 2013 Overlay Project
Multiple Locations
FY 2013 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Lewis | Legislative District: 20 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | WINLOCK |
Funding Year | 2013 |
Program | SCPP |
Current Phase | Withdrawn |
Legislative District | 20 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | Local Access |
Type of Work | Resurfacing |
Project Contact | Greg Robinson |
Contact Email | |
TIB Engineer | Chris Langhoff |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/18/2011 | |
Delayed Project Date | 07/01/2014 | |
Predesign Approval | ||
Design Approval | 02/01/2013 | |
Bid Auth. Approval | 06/01/2014 | |
Construction Approval | 07/01/2014 | |
Project Closeout | 12/31/2014 | |
Audit Date | ||
Withdrawn Date | 04/29/2013 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 0 | 0 |
Other Construction | 0 | 0 |
Total Construction | 0 | 0 |
Total TIB Funding | 0 | 0 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WINLOCK | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
This project will repair areas of base failure, place geotextile fabric, a 1-inch asphalt prelevel, and a 2-inch asphalt wearing course on SE 1st Street from Alder Street to Rice Street. Prior to constructing this project, the City is going to transfer the existing water services from a low pressure line to an 8-inch waterline. The City has the funds committed to complete this work prior to the overlay project.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |