The pavement condition ratings of the segment are as follow 8th Street - A St to D St 45 10th Street - B St to D St 72 D Street - 9th St to EOR South 56 Alpine Court - 10th St EOR South 40
Projects — TIB Project Information
TIB Project Information
City of Vader's 2021 Seal Coat
2-W-967(004)-1
2-W-967(004)-1
2021 Seal Coat
Multiple Locations
FY 2023 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Lewis | Legislative District: 20 | Project Length: 0.58 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | VADER |
Funding Year | 2023 |
Program | SCPP |
Current Phase | Withdrawn |
Legislative District | 20 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.58 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Dianne Floyd |
Contact Email | vadercity@centurylink.net |
TIB Engineer | Chris Langhoff |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2024 | |
Predesign Approval | ||
Design Approval | 02/01/2022 | 12/07/2021 |
Bid Auth. Approval | 03/01/2022 | 12/07/2021 |
Construction Approval | 07/15/2022 | 12/07/2021 |
Project Closeout | 09/15/2023 | |
Audit Date | ||
Withdrawn Date | 04/06/2023 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 62,113 | 62,113 |
Other Construction | 0 | 0 |
Total Construction | 62,113 | 62,113 |
Total TIB Funding | 0 | 62,113 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
VADER | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Prep work and chip seal
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |