The pavement condition rating of Maple Street - S 6th St to S 3rd St 44
Projects — TIB Project Information
TIB Project Information
City of Toledo's FY 2020 Rehabilitation Project
2-W-965(004)-1
2-W-965(004)-1
FY 2020 Rehabilitation Project
Multiple Locations
FY 2020 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $128,312
County: Lewis | Legislative District: 20 | Project Length: 0.15 | TIB Engineer: Chris Langhoff | Last Payment Date: 05/03/2021
Project Information
Lead Agency | TOLEDO |
Funding Year | 2020 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 20 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.15 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Jon Hinton |
Contact Email | jhinton@g-o.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | 05/03/2021 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2018 | |
Delayed Project Date | 07/01/2021 | |
Predesign Approval | ||
Design Approval | 01/01/2019 | 12/17/2018 |
Bid Auth. Approval | 05/01/2020 | 05/08/2020 |
Construction Approval | 06/02/2020 | 06/10/2020 |
Project Closeout | 04/30/2021 | 04/26/2021 |
Audit Date | 05/03/2021 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 17,550 | 17,550 |
Right of Way | 0 | 0 |
Total Design | 17,550 | 17,550 |
Construction Engineering | 17,550 | 12,879 |
Construction Contract | 117,000 | 98,702 |
Other Construction | 0 | 0 |
Total Construction | 134,550 | 111,581 |
Funding Surplus | - 23,788 | |
Total TIB Funding | 128,312 | 129,131 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
TOLEDO | 819 | 0.6% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 819 | 0.6% |
Project Description
The road surface will be pulverized, shaped, graded and overlaid with 2-inches of hot mix asphalt. Surplus material from the pulverization process will be used for shoulder finishing or removed. Sidewalks will be extended to the roadway surface and detectable warning surfaces installed. All pavement markings will be replaced in kind. A new centerline stripe will be installed.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |