City of Morton's FY 2014 Red Town Project

2-W-961(003)-1

2-W-961(003)-1
FY 2014 Red Town Project

Multiple Locations

FY 2014 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Lewis   |   Legislative District: 20   |   Project Length: 0.49   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency MORTON
Funding Year 2014
Program SCPP
Current Phase Withdrawn
Legislative District 20
Congressional District 0
Federal Route Number 9999
Project Length 0.49 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Mayor James Gerwig
Contact Email
TIB Engineer Chris Langhoff
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   11/16/2012
Delayed Project Date 07/01/2015  
Predesign Approval
Design Approval 01/01/2013 01/28/2013
Bid Auth. Approval 07/01/2013 06/24/2013
Construction Approval 03/01/2014
Project Closeout 12/30/2014
Audit Date  
Withdrawn Date   01/07/2014

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
MORTON 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 6.4%

Project Description

This project will grind and overlay Westlake Avenue from 2nd Street to Knittles Way and Airport Road from Westlake Avenue to the east end. This project will also grind the existing pavement on Adams Street, place a 1-inch asphalt prelevel and a 2-inch asphalt wearing course. The City is providing an additional $11,000 for utility work that will be completed in conjunction with the Adams Street work. Westlake Avenue from 2nd Street to Knittles Way and Airport Way from Westlake Avenue to the east end will also be overlayed with a 2-inch wearing course. All sidewalk ramps within the project limits will be upgraded to current standards.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments