City of Morton's FY 2013 Overlay Project

2-W-961(002)-1

2-W-961(002)-1
FY 2013 Overlay Project

Multiple Locations

FY 2013 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Lewis   |   Legislative District: 20   |   Project Length: 0.08   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency MORTON
Funding Year 2013
Program SCPP
Current Phase Withdrawn
Legislative District 20
Congressional District 3
Federal Route Number 9999
Project Length 0.08 mi.
ADT 150
Functional Class TIB Arterial
Type of Work Reconstruction
Project Contact Tamara "Tami" Clevenger
Contact Email cclerk@visitmorton.com
TIB Engineer Chris Langhoff
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   11/18/2011
Delayed Project Date 07/01/2014  
Predesign Approval
Design Approval 05/01/2012 05/15/2012
Bid Auth. Approval 06/01/2013
Construction Approval 07/01/2013
Project Closeout 03/30/2014
Audit Date  
Withdrawn Date   01/28/2013

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
MORTON 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

This project will grind the existing pavement on Adams Street, place a 1-inch asphalt prelevel and a 2-inch asphalt wearing course. The City is providing an additional $11,000 for utility work that will be completed in conjunction with the Adams Street work. Westlake Avenue from 2nd Street to Knittles Way and Airport Way from Westlake Avenue to the east end will also be overlayed with a 2-inch wearing course. All sidewalk ramps within the project limits will be upgraded to current standards.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.