City of Montesano's 2024 Chip Seal

2-W-957(016)-1

2-W-957(016)-1
2024 Chip Seal

Multiple Locations

FY 2025 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $216,000

County: Grays Harbor   |   Legislative District: 24   |   Project Length: 1.23   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency MONTESANO
Funding Year 2025
Program SCPP
Current Phase Design
Legislative District 24
Congressional District 6
Federal Route Number 9999
Project Length 1.23 mi.
ADT 0
Functional Class Principal
Type of Work Resurfacing
Project Contact Mike Olden
Contact Email molden@montesano.us
TIB Engineer Chris Langhoff
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 01/01/2025  
Predesign Approval
Design Approval 01/15/2024 12/19/2023
Bid Auth. Approval 07/15/2024
Construction Approval 07/15/2024
Project Closeout 08/20/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 216,000 230,700
Other Construction 0 0
Total Construction 216,000 230,700
     
Total TIB Funding 216,000 230,700

Local Funding Partners

Funding Amount Percent
MONTESANO 14,700 6.4%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 14,700 6.4%

Project Description

Apply Chip Seal and fog seal to the existing road surface.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments