The pavement condition rating of E Pioneer Avenue - Academy St to Glenn St 54.
Projects — TIB Project Information
TIB Project Information
City of Montesano's E Pioneer Avenue Overlay
2-W-957(007)-1
2-W-957(007)-1
E Pioneer Avenue Overlay
Academy St to Glenn St
FY 2023 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $106,444
County: Grays Harbor | Legislative District: 19 | Project Length: 0.19 | TIB Engineer: Chris Langhoff | Last Payment Date: 07/05/2022
Project Information
Lead Agency | MONTESANO |
Funding Year | 2023 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 19 |
Congressional District | 6 |
Federal Route Number | 9999 |
Project Length | 0.19 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Mike Olden |
Contact Email | molden@montesano.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | 07/05/2022 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2024 | |
Predesign Approval | ||
Design Approval | 02/01/2022 | 12/17/2021 |
Bid Auth. Approval | 05/01/2022 | 02/14/2022 |
Construction Approval | 05/15/2022 | 03/03/2022 |
Project Closeout | 08/15/2022 | 06/16/2022 |
Audit Date | 07/05/2022 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 110,000 | 135,475 |
Other Construction | 0 | 0 |
Total Construction | 110,000 | 135,475 |
Funding Increase | 530 | |
Funding Surplus | - 4,086 | |
Total TIB Funding | 106,444 | 135,475 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MONTESANO | 29,031 | 21.4% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 29,031 | 21.4% |
Project Description
Grind/Mill old existing pavement to 1-inch depth, to 1 from edge of existing pavement. Install overlay with 2-inch depth at centerline crown out to match 1-inch depth at edge to match existing. Pre-level as needed prior to final HMA course. Stripe.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |