The PCR rating for the selected segment is as follows Warren St - Alder St to Muck Creek Bridge 54
Projects — TIB Project Information
TIB Project Information
City of Roy's FY 2014 Overlay Project
2-P-814(001)-1
2-P-814(001)-1
FY 2014 Overlay Project
Multiple Locations
FY 2014 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $131,662
County: Pierce | Legislative District: 2 | Project Length: 0.09 | TIB Engineer: Greg Armstrong | Last Payment Date: 06/12/2015
Project Information
Lead Agency | ROY |
Funding Year | 2014 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 2 |
Congressional District | 10 |
Federal Route Number | 9999 |
Project Length | 0.09 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Karen Yates |
Contact Email | roymayor@comcast.net |
TIB Engineer | Greg Armstrong |
Last Payment Date | 06/12/2015 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2012 | |
Delayed Project Date | 07/01/2015 | |
Predesign Approval | ||
Design Approval | 04/01/2013 | 05/16/2013 |
Bid Auth. Approval | 04/01/2014 | 03/11/2014 |
Construction Approval | 04/15/2014 | 04/15/2014 |
Project Closeout | 12/31/2014 | 07/14/2014 |
Audit Date | 06/12/2015 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 21,345 | 23,093 |
Right of Way | 0 | 0 |
Total Design | 21,345 | 23,093 |
Construction Engineering | 21,345 | 14,110 |
Construction Contract | 142,300 | 94,459 |
Other Construction | 0 | 0 |
Total Construction | 163,645 | 108,569 |
Funding Surplus | - 53,328 | |
Total TIB Funding | 131,662 | 131,662 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ROY | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
This project will extend the improvements on Warren Street from the soon to be constructed Muck Creek Bridge to the north city limits. The work will consist of removing the existing pavement, placing crushed surfacing and 2.5 inches of HMA.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |