Projects — TIB Project Information
TIB Project Information
Town of Eatonville's Center Street E Overlay
2-P-811(004)-1
2-P-811(004)-1
Center Street E Overlay
Weyerhaeuser Wy to E C/L
FY 2024 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Pierce | Legislative District: 2 | Project Length: 0.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | EATONVILLE |
Funding Year | 2024 |
Program | SCPP |
Current Phase | Withdrawn |
Legislative District | 2 |
Congressional District | 8 |
Federal Route Number | |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | |
Type of Work | |
Project Contact | Seth Boettcher |
Contact Email | sboettcher@eatonville-wa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
Predesign Approval | ||
Design Approval | ||
Bid Auth. Approval | ||
Construction Approval | 05/08/2023 | |
Project Closeout | 09/15/2023 | |
Audit Date | ||
Withdrawn Date | 12/08/2022 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 0 | 0 |
Other Construction | 0 | 0 |
Total Construction | 0 | 0 |
Total TIB Funding | 0 | 0 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
EATONVILLE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
This project grinds, patches and provide a 2-inch overlay of Center Street E between Weyerhaeuser Way and the East C/L and upgrade 2 ADA ramps
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |