Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

Town of Eatonville's Center Street E Overlay

2-P-811(004)-1

2-P-811(004)-1
Center Street E Overlay

Weyerhaeuser Wy to E C/L

FY 2024 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Pierce   |   Legislative District: 2   |   Project Length: 0.00   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency EATONVILLE
Funding Year 2024
Program SCPP
Current Phase Withdrawn
Legislative District 2
Congressional District 8
Federal Route Number
Project Length 0.00 mi.
ADT 0
Functional Class
Type of Work
Project Contact Seth Boettcher
Contact Email sboettcher@eatonville-wa.gov
TIB Engineer Greg Armstrong
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
Predesign Approval
Design Approval
Bid Auth. Approval
Construction Approval 05/08/2023
Project Closeout 09/15/2023
Audit Date  
Withdrawn Date   12/08/2022

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
EATONVILLE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

This project grinds, patches and provide a 2-inch overlay of Center Street E between Weyerhaeuser Way and the East C/L and upgrade 2 ADA ramps

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments