Projects — TIB Project Information
TIB Project Information
City of Buckley's FY 2019 Rehabilitation Project
2-P-808(005)-1
2-P-808(005)-1
FY 2019 Rehabilitation Project
Multiple Locations
FY 2019 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $152,275
County: Pierce | Legislative District: 31 | Project Length: 0.26 | TIB Engineer: Greg Armstrong | Last Payment Date: 01/02/2020
Project Information
Lead Agency | BUCKLEY |
Funding Year | 2019 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 31 |
Congressional District | 8 |
Federal Route Number | 3189 |
Project Length | 0.26 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Dave Schmidt |
Contact Email | dschmidt@cityofbuckley.com |
TIB Engineer | Greg Armstrong |
Last Payment Date | 01/02/2020 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/17/2017 | |
Delayed Project Date | 07/01/2020 | |
Predesign Approval | ||
Design Approval | 01/01/2018 | 12/18/2017 |
Bid Auth. Approval | 04/01/2019 | 12/18/2017 |
Construction Approval | 05/01/2019 | 02/14/2019 |
Project Closeout | 12/15/2019 | 12/09/2019 |
Audit Date | 01/02/2020 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 9,024 | 0 |
Right of Way | 0 | 0 |
Total Design | 9,024 | 0 |
Construction Engineering | 14,962 | 12,471 |
Construction Contract | 149,426 | 147,828 |
Other Construction | 0 | 0 |
Total Construction | 164,388 | 160,299 |
Funding Increase | 9,967 | |
Funding Surplus | - 31,104 | |
Total TIB Funding | 152,275 | 160,299 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
BUCKLEY | 8,024 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 8,024 | 5.0% |
Project Description
Grind pavement to 2-inch depth. Repair/patch subgrade in isolated areas. Overlay with 2-inches HMA. Replace two detection loops if needed. Restripe.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |