City of Goldendale's FY 2012 Overlay Project
2-E-935(001)-1
2-E-935(001)-1
FY 2012 Overlay Project
Multiple Locations
FY 2012 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $105,918
County: Klickitat | Legislative District: 14 | Project Length: 0.17 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/16/2011
Project Information
Lead Agency | GOLDENDALE |
Funding Year | 2012 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 14 |
Congressional District | 3 |
Federal Route Number | K201 |
Project Length | 0.17 mi. |
ADT | 300 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Keith Grundei |
Contact Email | kgrundei@ci.goldendale.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/16/2011 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2010 | |
Delayed Project Date | 07/01/2013 | |
Predesign Approval | ||
Design Approval | 12/15/2010 | 12/16/2010 |
Bid Auth. Approval | 03/01/2011 | 12/16/2010 |
Construction Approval | 04/01/2011 | 06/24/2011 |
Project Closeout | 01/01/2012 | 11/08/2011 |
Audit Date | 11/16/2011 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 9,285 | 9,335 |
Right of Way | 0 | 0 |
Total Design | 9,285 | 9,335 |
Construction Engineering | 9,285 | 8,090 |
Construction Contract | 81,706 | 94,068 |
Other Construction | 0 | 0 |
Total Construction | 90,991 | 102,158 |
Funding Increase | 5,642 | |
Total TIB Funding | 105,918 | 111,493 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
GOLDENDALE | 5,575 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 5,575 | 5.0% |
Project Description
This project will repair areas of base failure with digouts and overlay the Railroad Avenue between Columbus Street and Golden Street with a 2-inch overlay and geotextile fabric.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |