Existing sidewalk on 2nd Street is badly spalled across the entire surface. The existing sidewalk in front of the fire station on Main Street is cracked.
Projects — TIB Project Information
TIB Project Information
Town of LaCrosse's FY 2013 Sidewalk Maintenance Project
2-E-912(003)-1
2-E-912(003)-1
FY 2013 Sidewalk Maintenance Project
Multiple Locations
FY 2013 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $39,738
County: Whitman | Legislative District: 9 | Project Length: 0.09 | TIB Engineer: Jonathan Heusman | Last Payment Date: 09/13/2012
Project Information
Lead Agency | LACROSSE |
Funding Year | 2013 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.09 mi. |
ADT | 257 |
Functional Class | |
Type of Work | |
Project Contact | Larry Burgess |
Contact Email | lacrosse@pionnet.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 09/13/2012 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/18/2011 | |
Delayed Project Date | 07/01/2014 | |
Predesign Approval | ||
Design Approval | 01/01/2012 | 12/01/2011 |
Bid Auth. Approval | 05/01/2012 | 12/01/2011 |
Construction Approval | 06/01/2012 | 05/14/2012 |
Project Closeout | 10/31/2012 | 08/29/2012 |
Audit Date | 09/13/2012 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 1,500 | 3,335 |
Right of Way | 0 | 0 |
Total Design | 1,500 | 3,335 |
Construction Engineering | 1,500 | 3,613 |
Construction Contract | 33,136 | 32,790 |
Other Construction | 0 | 0 |
Total Construction | 34,636 | 36,403 |
Funding Increase | 3,602 | |
Total TIB Funding | 39,738 | 39,738 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
LACROSSE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project reconstructs sections of sidewalk on Main Streets between Second Street and the north corner of City Hall. Per the TIB Executive Director, the town reduced the scope of work to stay within the project budget.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |