The existing roadways are good candidates for chip seal. The pavement condition ratings range from 72 to 81. No sidewalk exists.
Projects — TIB Project Information
TIB Project Information
Town of Colton's FY 2009 Seal Coat Project
2-E-908(001)-1
2-E-908(001)-1
FY 2009 Seal Coat Project
Multiple Locations
FY 2009 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $15,096
County: Whitman | Legislative District: 9 | Project Length: 0.77 | TIB Engineer: Jonathan Heusman | Last Payment Date: 02/02/2009
Project Information
Lead Agency | COLTON |
Funding Year | 2009 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.77 mi. |
ADT | 250 |
Functional Class | Local Access |
Type of Work | Resurfacing |
Project Contact | Bill Frye |
Contact Email | wjfh20@yahoo.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 02/02/2009 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2007 | |
Delayed Project Date | 07/01/2010 | |
Predesign Approval | ||
Design Approval | 01/01/2008 | 02/06/2008 |
Bid Auth. Approval | 01/01/2008 | 02/06/2008 |
Construction Approval | 07/01/2008 | 06/01/2008 |
Project Closeout | 01/30/2009 | 01/28/2009 |
Audit Date | 02/02/2009 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 17,148 | 15,096 |
Other Construction | 0 | 0 |
Total Construction | 17,148 | 15,096 |
Funding Surplus | - 2,052 | |
Total TIB Funding | 15,096 | 15,096 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COLTON | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Chip Seal College Street - Steptoe Street to Summit Street Fountain Street - Line Street to Summit Street Harrison Street - Gregor Street to Summit Street Lake Street - College Street to Harrison Street Lincoln Street - Summit Street to East City Limits
Existing Condition
Project Benefits
- Extended road life;
- Low cost solution
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |