Town of Springdale's FY 2010 Overlay Project

2-E-906(001)-1

2-E-906(001)-1
FY 2010 Overlay Project

N 1st St - Shaffer (SR 231) to Morton St

FY 2010 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Stevens   |   Legislative District: 7   |   Project Length: 0.15   |   TIB Engineer: Andrew Beagle   |   Last Payment Date:

Project Information

Lead Agency SPRINGDALE
Funding Year 2010
Program SCPP
Current Phase Withdrawn
Legislative District 7
Congressional District 5
Federal Route Number 9999
Project Length 0.15 mi.
ADT 200
Functional Class TIB Arterial
Type of Work Reconstruction
Project Contact Lisa Sheppard
Contact Email springdale.townhall@ecliptixnet.com
TIB Engineer Andrew Beagle
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2008
Delayed Project Date 07/01/2011  
Predesign Approval
Design Approval 01/01/2009 06/16/2009
Bid Auth. Approval 01/01/2010 06/16/2009
Construction Approval 04/01/2011
Project Closeout 10/31/2011
Audit Date  
Withdrawn Date   10/31/2011

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
SPRINGDALE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

This project will overlay First Street between Harrison and Morton Street. Several digouts are planned to address base problems. From Shaffer to Harrison, plans include gravel fill and overlay of the west shoulder to widen the driving surface. Pavement improvements at the Shaffer intersection are proposed if funds allow.

Project Pictures

Project Delays

Delay Type Resolution Date Comments
Coordination Issues
Level 1 Board Delay
10/31/2011 City is waiting for the completion of waterline work before advertising paving work Spring 2012.