TIB Project Information

City of Kettle Falls's Evergreen Drive

2-E-903(002)-1

2-E-903(002)-1
Evergreen Drive

300' n/o Narcissus Ct to Oak St

FY 2015 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $71,005

County: Stevens   |   Legislative District: 7   |   Project Length: 0.13   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 02/17/2015

Project Information

Lead Agency KETTLE FALLS
Funding Year 2015
Program SCPP
Current Phase Audit
Legislative District 7
Congressional District 5
Federal Route Number 9999
Project Length 0.13 mi.
ADT 0
Functional Class Local Access
Type of Work Resurfacing
Project Contact David Keeley
Contact Email dkeeley@kettle-falls.com
TIB Engineer Andrew Beagle
Last Payment Date 02/17/2015

Project Schedule

  Target Date Actual Date
Project Selection Date   08/20/2014
Delayed Project Date 07/01/2017  
Predesign Approval
Design Approval 08/20/2014 08/20/2014
Bid Auth. Approval 09/01/2014 08/20/2014
Construction Approval 09/15/2014 09/19/2014
Project Closeout 02/01/2015 02/09/2015
Audit Date   02/17/2015
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 2,500 2,100
Right of Way 0 0
Total Design 2,500 2,100
     
Construction Engineering 2,500 2,456
Construction Contract 45,000 63,398
Other Construction 0 3,050
Total Construction 47,500 68,905
     
Funding Increase 22,922  
Funding Surplus - 1,917  
Total TIB Funding 71,005 71,005

Local Funding Partners

Funding Amount Percent
KETTLE FALLS 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The city proposes to pulverize and incorporate the existing surface into the base. Amending and shaping the base creates better structure and crown to aid in draining the surface. Capping the base with an overlay provides a smooth, low maintenance street. The city will provide catch basins and a drywell to ensure proper drainage.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments