Alligator cracking and utility patching appear on the King Street surface. Existing sidewalk and curbing on both sides of the street is in fair condition. No ADA ramps exist. The current pavement condition rating is 45.
Projects — TIB Project Information
TIB Project Information
City of Chewelah's FY 2015 Overlay Project
2-E-901(001)-1
2-E-901(001)-1
FY 2015 Overlay Project
Multiple Locations
FY 2015 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $120,648
County: Stevens | Legislative District: 7 | Project Length: 0.27 | TIB Engineer: Andrew Beagle | Last Payment Date: 03/02/2015
Project Information
Lead Agency | CHEWELAH |
Funding Year | 2015 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 7 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.27 mi. |
ADT | 0 |
Functional Class | Local Access |
Type of Work | Resurfacing |
Project Contact | Mike Frizzell |
Contact Email | mfrizzell@cityofchewelah.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | 03/02/2015 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2013 | |
Delayed Project Date | 07/01/2016 | |
Predesign Approval | ||
Design Approval | 01/01/2014 | 01/08/2014 |
Bid Auth. Approval | 06/01/2014 | 06/05/2014 |
Construction Approval | 07/01/2014 | 07/09/2014 |
Project Closeout | 02/01/2015 | 02/18/2015 |
Audit Date | 03/02/2015 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 9,028 | 9,493 |
Right of Way | 0 | 0 |
Total Design | 9,028 | 9,493 |
Construction Engineering | 8,075 | 7,277 |
Construction Contract | 89,790 | 110,228 |
Other Construction | 0 | 0 |
Total Construction | 97,865 | 117,505 |
Funding Increase | 13,755 | |
Total TIB Funding | 120,648 | 126,997 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CHEWELAH | 6,349 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 6,349 | 5.0% |
Project Description
The project seals cracks, repairs pavement and provides a two inch overlay on King Street between Stevens Street and rail crossing west of SR 395. The scope includes upgrade of ADA ramps to the current standard and replacement of non-adjustable catch basin grates.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |