The following streets are of sufficient structure that an overlay is an economical solution to extend their life Florence St - Warren Ave to 440' N Beach St - Florence St to Eveline St Beach St - 495' S of Cris St to Cris St Cris St - Warren Ave to Beach St None of the segments have existing sidewalk.
Projects — TIB Project Information
TIB Project Information
City of Pateros's 2007 Overlay Project
2-E-883(001)-1
2-E-883(001)-1
2007 Overlay Project
FY 2008 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $25,022
County: Okanogan | Legislative District: 12 | Project Length: 1,610.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 08/20/2007
Project Information
Lead Agency | PATEROS |
Funding Year | 2008 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 1610.00 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Dale Parks |
Contact Email | pateros@nwi.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 08/20/2007 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 06/07/2007 | |
Delayed Project Date | 07/01/2009 | |
Predesign Approval | ||
Design Approval | ||
Bid Auth. Approval | 06/07/2007 | 06/07/2007 |
Construction Approval | 03/29/2007 | 03/29/2007 |
Project Closeout | 08/17/2007 | |
Audit Date | 08/20/2007 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 25,100 | 25,022 |
Other Construction | 0 | 0 |
Total Construction | 25,100 | 25,022 |
Funding Surplus | - 78 | |
Total TIB Funding | 25,022 | 25,022 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
PATEROS | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project provides a 2-in overlay on the following segments Florence St - Warren Ave to 440' N Beach St - Florence St to Eveline St Beach St - 495' S of Cris St to Cris St Cris St - Warren Ave to Beach St
Existing Condition
Project Benefits
- Extend pavement life;
- Provide smooth driving surface
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |