City of Pateros's 2007 Overlay Project

2-E-883(001)-1

2-E-883(001)-1
2007 Overlay Project

FY 2008 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $25,022

County: Okanogan   |   Legislative District: 12   |   Project Length: 1,610.00   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 08/20/2007

Project Information

Lead Agency PATEROS
Funding Year 2008
Program SCPP
Current Phase Audit
Legislative District 12
Congressional District 4
Federal Route Number 9999
Project Length 1610.00 mi.
ADT 0
Functional Class Collector
Type of Work Resurfacing
Project Contact Dale Parks
Contact Email pateros@nwi.net
TIB Engineer Andrew Beagle
Last Payment Date 08/20/2007

Project Schedule

  Target Date Actual Date
Project Selection Date   06/07/2007
Delayed Project Date 07/01/2009  
Predesign Approval
Design Approval
Bid Auth. Approval 06/07/2007 06/07/2007
Construction Approval 03/29/2007 03/29/2007
Project Closeout 08/17/2007
Audit Date   08/20/2007
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 25,100 25,022
Other Construction 0 0
Total Construction 25,100 25,022
     
Funding Surplus - 78  
Total TIB Funding 25,022 25,022

Local Funding Partners

Funding Amount Percent
PATEROS 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project provides a 2-in overlay on the following segments Florence St - Warren Ave to 440' N Beach St - Florence St to Eveline St Beach St - 495' S of Cris St to Cris St Cris St - Warren Ave to Beach St

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments