Town of Waterville's FY 2013 Overlay Project

2-E-854(003)-1

2-E-854(003)-1
FY 2013 Overlay Project

Multiple Locations

FY 2013 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $117,439

County: Douglas   |   Legislative District: 12   |   Project Length: 0.22   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 02/13/2015

Project Information

Lead Agency WATERVILLE
Funding Year 2013
Program SCPP
Current Phase Audit
Legislative District 12
Congressional District 4
Federal Route Number 9999
Project Length 0.22 mi.
ADT 127
Functional Class Local Access
Type of Work Resurfacing
Project Contact Mayor Royal DeVaney
Contact Email waterville@nwi.net
TIB Engineer Andrew Beagle
Last Payment Date 02/13/2015

Project Schedule

  Target Date Actual Date
Project Selection Date   11/18/2011
Delayed Project Date 07/01/2014  
Predesign Approval
Design Approval 01/01/2012 12/13/2011
Bid Auth. Approval 05/01/2012 12/13/2011
Construction Approval 05/15/2014 05/21/2014
Project Closeout 01/15/2015 02/17/2015
Audit Date   02/17/2015
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 12,465 15,748
Right of Way 0 0
Total Design 12,465 15,748
     
Construction Engineering 0 11,458
Construction Contract 112,184 90,233
Other Construction 0 0
Total Construction 112,184 101,691
     
Funding Increase 4,560  
Funding Surplus - 11,770  
Total TIB Funding 117,439 117,439

Local Funding Partners

Funding Amount Percent
WATERVILLE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project grinds and overlays E 3rd Street between Baker and Monroe.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.