City of Leavenworth's FY 2017 Overlay Project

2-E-850(002)-1

2-E-850(002)-1
FY 2017 Overlay Project

Multiple Locations

FY 2017 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $477,000

County: Chelan   |   Legislative District: 12   |   Project Length: 0.51   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 01/30/2019

Project Information

Lead Agency LEAVENWORTH
Funding Year 2017
Program SCPP
Current Phase Audit
Legislative District 12
Congressional District 8
Federal Route Number 9999
Project Length 0.51 mi.
ADT 350
Functional Class TIB Arterial
Type of Work Reconstruction
Project Contact Joel Walinski
Contact Email cityadministrator@cityofleavenworth.com
TIB Engineer Andrew Beagle
Last Payment Date 01/30/2019

Project Schedule

  Target Date Actual Date
Project Selection Date   11/20/2015
Delayed Project Date 07/01/2018  
Predesign Approval
Design Approval 01/15/2016 12/10/2015
Bid Auth. Approval 04/01/2017 04/05/2017
Construction Approval 02/15/2018 03/06/2018
Project Closeout 12/31/2018 01/02/2019
Audit Date   01/30/2019
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 56,883 58,099
Right of Way 0 0
Total Design 56,883 58,099
     
Construction Engineering 41,784 38,319
Construction Contract 378,333 409,768
Other Construction 0 0
Total Construction 420,117 448,087
     
Total TIB Funding 477,000 506,186

Local Funding Partners

Funding Amount Percent
LEAVENWORTH 29,186 5.8%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 29,186 5.8%

Project Description

This project rehabilitates the following streets - Commercial Street Joseph to 3rd - Whitman Street Ski Hill Drive to Woodward - Enchantment Parkway Scholze to Commercial The city proposes full depth reclamation and cement treated base to stabilize the road structure. A hot mix overlay provides a smooth surface for the streets.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.