The existing streets are in poor condition. There streets were surfaced without base. Extensive alligatoring and potholes exist. Current pavement condition ratings range from 41 to 45.
Projects — TIB Project Information
TIB Project Information
City of Leavenworth's FY 2017 Overlay Project
2-E-850(002)-1
2-E-850(002)-1
FY 2017 Overlay Project
Multiple Locations
FY 2017 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $477,000
County: Chelan | Legislative District: 12 | Project Length: 0.51 | TIB Engineer: Andrew Beagle | Last Payment Date: 01/30/2019
Project Information
Lead Agency | LEAVENWORTH |
Funding Year | 2017 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 8 |
Federal Route Number | 9999 |
Project Length | 0.51 mi. |
ADT | 350 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Joel Walinski |
Contact Email | cityadministrator@cityofleavenworth.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 01/30/2019 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/20/2015 | |
Delayed Project Date | 07/01/2018 | |
Predesign Approval | ||
Design Approval | 01/15/2016 | 12/10/2015 |
Bid Auth. Approval | 04/01/2017 | 04/05/2017 |
Construction Approval | 02/15/2018 | 03/06/2018 |
Project Closeout | 12/31/2018 | 01/02/2019 |
Audit Date | 01/30/2019 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 56,883 | 58,099 |
Right of Way | 0 | 0 |
Total Design | 56,883 | 58,099 |
Construction Engineering | 41,784 | 38,319 |
Construction Contract | 378,333 | 409,768 |
Other Construction | 0 | 0 |
Total Construction | 420,117 | 448,087 |
Total TIB Funding | 477,000 | 506,186 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
LEAVENWORTH | 29,186 | 5.8% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 29,186 | 5.8% |
Project Description
This project rehabilitates the following streets - Commercial Street Joseph to 3rd - Whitman Street Ski Hill Drive to Woodward - Enchantment Parkway Scholze to Commercial The city proposes full depth reclamation and cement treated base to stabilize the road structure. A hot mix overlay provides a smooth surface for the streets.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |