City of Ritzville's FY 2021 Seal Coat Project

2-E-845(007)-1

2-E-845(007)-1
FY 2021 Seal Coat Project

Multiple Locations

FY 2021 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $14,250

County: Adams   |   Legislative District: 9   |   Project Length: 0.36   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 09/09/2020

Project Information

Lead Agency RITZVILLE
Funding Year 2021
Program SCPP
Current Phase Withdrawn
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 0.36 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Scott Yaeger
Contact Email scotty@co.adams.wa.us
TIB Engineer Jonathan Heusman
Last Payment Date 09/09/2020

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2019
Delayed Project Date 07/01/2022  
Predesign Approval
Design Approval 02/01/2020 12/24/2019
Bid Auth. Approval 02/28/2021
Construction Approval 03/30/2021
Project Closeout 10/31/2021
Audit Date  
Withdrawn Date   09/10/2020

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 14,250 15,000
Right of Way 0 0
Total Design 14,250 15,000
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 14,250 15,000

Local Funding Partners

Funding Amount Percent
RITZVILLE 750 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 750 5.0%

Project Description

County chip seal followed by contractor slurry seal. This project goes right through the city's downtown central business district

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.