Projects — TIB Project Information
TIB Project Information
City of Ritzville's FY 2017 Overlay Project
2-E-845(004)-1
2-E-845(004)-1
FY 2017 Overlay Project
Multiple Locations
FY 2017 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $175,908
County: Adams | Legislative District: 9 | Project Length: 0.13 | TIB Engineer: Jonathan Heusman | Last Payment Date: 02/15/2017
Project Information
Lead Agency | RITZVILLE |
Funding Year | 2017 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 4 |
Federal Route Number | M011 |
Project Length | 0.13 mi. |
ADT | 350 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Larry Swift |
Contact Email | larry.swift@ritzville-wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 02/15/2017 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/20/2015 | |
Delayed Project Date | 07/01/2018 | |
Predesign Approval | ||
Design Approval | 01/15/2016 | 01/11/2016 |
Bid Auth. Approval | 04/01/2016 | 04/26/2016 |
Construction Approval | 06/01/2016 | 05/23/2016 |
Project Closeout | 12/31/2016 | 02/07/2017 |
Audit Date | 02/15/2017 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 21,923 | 15,623 |
Right of Way | 0 | 0 |
Total Design | 21,923 | 15,623 |
Construction Engineering | 21,923 | 16,681 |
Construction Contract | 146,154 | 157,565 |
Other Construction | 0 | 0 |
Total Construction | 168,077 | 174,246 |
Funding Increase | 1,982 | |
Funding Surplus | - 16,074 | |
Total TIB Funding | 175,908 | 189,869 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
RITZVILLE | 13,961 | 7.4% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 13,961 | 7.4% |
Project Description
This project will grind off the existing 2' of HMA and replace it with a thicker 4' section over the existing 9-12' of base course and geogrid already in place. In addition, upgrades 5 ADA ramps.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |