Town of Lind's 2024 Scrub Seal

2-E-843(003)-1

2-E-843(003)-1
2024 Scrub Seal

Multiple Locations

FY 2025 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $128,471

County: Adams   |   Legislative District: 9   |   Project Length: 0.84   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency LIND
Funding Year 2025
Program SCPP
Current Phase Design
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 0.84 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Paula Bell
Contact Email mayorbell.lind@gmail.com
TIB Engineer Jonathan Heusman
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
Predesign Approval
Design Approval 01/01/2024 01/04/2024
Bid Auth. Approval 06/01/2024
Construction Approval 07/01/2024
Project Closeout 09/01/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 10,705 10,705
Right of Way 0 0
Total Design 10,705 10,705
     
Construction Engineering 10,705 10,705
Construction Contract 107,061 107,061
Other Construction 0 0
Total Construction 117,766 117,766
     
Total TIB Funding 128,471 128,471

Local Funding Partners

Funding Amount Percent
LIND 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

scrub seal.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.