Town of Lind's FY 2019 Rehabilitation Project

2-E-843(001)-1

2-E-843(001)-1
FY 2019 Rehabilitation Project

Multiple Locations

FY 2019 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $49,394

County: Adams   |   Legislative District: 9   |   Project Length: 0.00   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 10/01/2019

Project Information

Lead Agency LIND
Funding Year 2019
Program SCPP
Current Phase Audit
Legislative District 9
Congressional District 4
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Jamie Schmunk
Contact Email townoflind@sosmail.us
TIB Engineer Jonathan Heusman
Last Payment Date 10/01/2019

Project Schedule

  Target Date Actual Date
Project Selection Date   11/17/2017
Delayed Project Date 07/01/2020  
Predesign Approval
Design Approval 01/01/2018 12/11/2017
Bid Auth. Approval 04/01/2019 02/26/2019
Construction Approval 03/26/2019 04/04/2019
Project Closeout 10/31/2019 09/25/2019
Audit Date   10/01/2019
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 8,786 70,487
Right of Way 0 0
Total Design 8,786 70,487
     
Construction Engineering 2,636 40,201
Construction Contract 24,862 284,458
Other Construction 0 0
Total Construction 27,498 324,659
     
Funding Increase 13,110  
Total TIB Funding 49,394 395,146

Local Funding Partners

Funding Amount Percent
LIND 0 0.0%
WSDOT Funding 0 0.0%
FEMA  345,752 87.5%
 
 
 
 
 
 
 
Total Local Funding 345,752 87.5%

Project Description

This project is a FEMA match project. The project will fix roads that deteriorated during the winter of 2017.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments