City of Sunnyside
6th Street
North Ave to Decatur Ave
TIB Award Amount
$327,240
Region: East   |   Legislative District: 15   |   Length: 2,170.00 ft. FY 2023 Sidewalk Program (SP)

Existing Conditions

The amount requested in this Sidewalk Program application is the sidewalk replacement cost of a larger reconstruction project. Roadway reconstruction is funded by the Surface Transportation Program. The sidewalk elements included in this application include ADA improvements, sidewalk, and bulb-outs necessary to meet intermodal transportation needs within the downtown core. These improvements are a continuation of the Citys downtown revitalization multi-phased project which intends to increase economic stability by replacing aging and nonscript infrastructure. The improvements will construct complete streets elements to encourage intermodal transportation and enhance pedestrian safety.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 327,240 3,158,360 3,485,600
Project Totals $327,240 $3,158,360 $3,485,600

Local Match

TIB Participation Local Match Minimum Local Match
9.4% 90.6% 10%

Description of Improvements

This project will include new sidewalk infrastructure and ADA ramps, a railroad crossing treatment, and bulbouts.