Projects — TIB Funding Cycles
FY 2023 SP Selections
|
|
||||
Region: East | Legislative District: 3 | Length: 950.00 ft. | FY 2023 Sidewalk Program (SP) |
Existing ConditionsHaven St. is an existing Principal Arterial and high traffic corridor and Spokane Transit bus route uses this street. The corridor includes numerous nearby commercial/business destinations as well as a large Spokane School District education campus approximately one block from Haven St. that includes Shaw Middle School, Newtech Skill Center, Regal Elementary School and School District offices and operations facilities. Additionally, the Spokane-Hillyard Library and Northeast Community Center is located just west of the education campus.There are no existing sidewalks along the westerly side of Haven St. for the three block stretch from Heroy Ave. to Rockwell Ave. creating a deficient condition for pedestrian access to transit stops, schools and businesses. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 19,594 | 8,398 | 27,992 |
Right of Way | 0 | 0 | 0 |
Construction | 187,776 | 80,476 | 268,252 |
Project Totals | $207,371 | $88,873 | $296,244 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
70.0% | 30.0% | 20% |
Summary of Improvements
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Description of Improvements
Install infill separated sidewalk and requisite ADA ramps along the westerly side of Haven St. where no sidewalk exists today.