FY 2023 SCPP Selections
|
|
||||
Region: East | Legislative District: 15 | Length: 0.00 mi. | FY 2023 Small City Preservation Program (SCPP) |
Existing Conditions |
Anticipated Project Costs
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 45,777 | 0 | 45,777 |
Right of Way | 0 | 0 | 0 |
Construction | 354,223 | 0 | 354,223 |
Project Totals | $400,000 | $0 | $400,000 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Summary of Improvements
Description of Improvements
Grind and 2-inch overlay of S Main Street from South St to Maple St and upgrade 12 ADA ramps