City of Zillah
FY 2022 Overlay Project
Multiple Locations
TIB Award Amount
$247,882
Region: East   |   Legislative District: 15   |   Length: 0.00 mi. FY 2022 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 28,620 3,180 31,800
Right of Way 0 0 0
Construction 219,262 24,363 243,625
Project Totals $247,882 $27,543 $275,425

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 5%

Description of Improvements

Grind existing asphalt by 2 inches, reuse as base. Resurface with 2 inch overlay