Region: East | Legislative District: 15 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
Existing Conditions |
Anticipated Project Costs
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 28,620 | 3,180 | 31,800 |
Right of Way | 0 | 0 | 0 |
Construction | 219,262 | 24,363 | 243,625 |
Project Totals | $247,882 | $27,543 | $275,425 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
Summary of Improvements
Description of Improvements
Grind existing asphalt by 2 inches, reuse as base. Resurface with 2 inch overlay