Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
Anticipated Project Costs
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 2,375 | 125 | 2,500 |
Right of Way | 0 | 0 | 0 |
Construction | 37,989 | 1,999 | 39,988 |
Project Totals | $40,364 | $2,124 | $42,488 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
Description of Improvements
W. Franklin Street provides access to local residents. Connell plans to replace the water main in W. Franklin Street in combination with the proposed street work. Work includes crack sealing, minor pavement repairs and prelevel work, and chip sealing.