Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
Anticipated Project Costs
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 9,200 | 0 | 9,200 |
Right of Way | 0 | 0 | 0 |
Construction | 96,913 | 0 | 96,913 |
Project Totals | $106,113 | $0 | $106,113 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Summary of Improvements
Description of Improvements
The project provides pavement repair, crack seal and chip seal of the approved segments.