FY 2024 ATP Selections

City of Tonasket
4th Street Multimodal
Multiple Locations
TIB Award Amount
$395,277
Region: East   |   Legislative District: 7   |   Length: 1,050.00 ft. FY 2024 Urban Active Transportation Program (ATP)

Existing Conditions

There is currently a 2-1/2 block gap in the sidewalk on the south side of 4th Street between Tonasket Avenue and the K-12 school campus. 4th Street is one of the primary connectors between the residential area on the west side of town, the downtown corridor, and the Tonasket School District campus. The campus includes K-12 schools, tennis courts, the football stadium, baseball/softball fields and track. The City and School District are coordinating to improve bicycle routes for students, residents, and visitors. The existing width of 4th Street provides adequate room to add bike lanes on each side of the road. Additionally, the downtown corridor regularly experiences flooding during large storm events.

Project Funding

  TIB Funds Local Funds Total Costs
Design 51,690 0 51,690
Right of Way 0 0 0
Construction 343,587 0 343,587
Project Totals $395,277 $0 $395,277

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Construct 5-foot sidewalk on the south side, and bike lanes on both sides of 4th Street within existing pavement width. Install ADA-compliant ramps at each intersection.