Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Funding Cycles

FY 2024 APP Selections

City of Ellensburg
Main Street Overlay
3rd Ave to University Way
TIB Award Amount
$400,000
Region: Southeast   |   Legislative District: 13   |   Length: 0.00 mi. FY 2024 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 9,865 5,135 15,000
Right of Way 0 0 0
Construction 390,135 203,065 593,200
Project Totals $400,000 $208,200 $608,200

Local Match

TIB Participation Local Match Minimum Local Match
65.8% 34.2% 15%

Description of Improvements

Pavement distress appears to be surface degradation only. Use 2 in. HMA grind and overlay to preserve pavement, and fill-in missing segment between two other recent overlay projects. City to pay for curb ramp and sidewalk replacement. Main Street - 3rd Ave to University Way