Region: Southeast | Legislative District: 15 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 32,310 | 3,590 | 35,900 |
Right of Way | 0 | 0 | 0 |
Construction | 288,333 | 32,037 | 320,370 |
Project Totals | $320,643 | $35,627 | $356,270 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Summary of Improvements
Description of Improvements
Grind and 2-inch overlay of Longfibre Road from Valley Mall Blvd to Ahtanum Rd.