Region: Southeast | Legislative District: 16 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 42,750 | 4,750 | 47,500 |
Right of Way | 0 | 0 | 0 |
Construction | 372,240 | 41,360 | 413,600 |
Project Totals | $414,990 | $46,110 | $461,100 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Summary of Improvements
Description of Improvements
Grind and overlay 2-inch depth.