Projects — TIB Funding Cycles
FY 2023 APP Selections
|
|
||||
Region: Southeast | Legislative District: 15 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 34,515 | 3,835 | 38,350 |
Right of Way | 0 | 0 | 0 |
Construction | 302,647 | 33,628 | 336,275 |
Project Totals | $337,162 | $37,463 | $374,625 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Summary of Improvements
Description of Improvements
Grind and 2-inch overlay of Fremont Avenue between 4th St and 11th St - 8 ADA ramps.